Procedural & Instructional Writing
When the only person who knows how it is done is the person who does it, every question comes back to them.
I turn expert knowledge, demonstrations, transcripts, and rough notes into instructions people can follow without asking the expert again.
- Procedure design
- SOPs
- Training guides
- Reference material
- SME interviewing
Subject expertise stays with the expert. Documentation expertise stays with me.
Why this craft matters
This page is the writing craft behind the systems on the rest of this site. The same discipline that produced the product and support documentation in the case studies is shown here at sentence level: What a raw expert explanation leaves open, and what a written procedure closes.
The business case is simple. Knowledge that lives only in an expert costs the expert's time on every repeat question, puts quality at the mercy of who is available, and walks out the door when they do. A procedure a reader can follow without help converts that dependency into an asset: The expert answers once, the answer holds, and training, quality, and coverage stop depending on one person's calendar.
Everything below is a worked demonstration of how that conversion happens, using a constructed field-service example.
People keep asking the same questions
One source, and the document built from it, in five steps. The second step is the work. Anyone can retype a transcript.
The source is fictional; the method is the one I use.
01Raw expert explanation
Spoken explanation. No formal procedure supplied.
Right so the belt, you check it every couple of weeks, more if
the machine's been running hot. Pop the guard off first,
obviously kill the power at the isolator before you go anywhere
near it. Push down in the middle of the span with your thumb and
see how far the drive belt gives. Should be about right, you'll
feel when it's correct, too tight is worse than too loose. If the
vee needs pulling up you slacken the four bolts on the motor foot
and lever it back, then nip them up again. Don't do it with the
machine turning, that's just common sense. Give the band a look
for cracks while you're in there.02What I found
Six findings. Each one is a decision the source leaves open.
The isolation step arrives mid-sentence as an aside, and it is the first prerequisite of the whole task.
The source names a thumb, a guard, and four bolts. It gives no gauge, no spanner size, and no belt identification.
Order is implied by “then”, with no defined start point and no stop point.
Experience-based judgment appears as a step. It is either a permitted variation or an observable criterion.
One safety statement gives no consequence and names no owner, so it returns flagged Safety verify.
The source names one component four ways, and the document needs one approved term.
03Rewritten procedure
MNT-07: Drive belt tension check
Purpose
Confirm that drive belt tension is inside the approved deflection figure.
Added structure
Before you begin
- Set the machine isolator to OFF and apply your personal lock and tag.
- Confirm that the drive has stopped.
- Obtain the approved deflection figure from the machine data sheet.
Materials
- Tension gauge, 0 N to 100 N.
- Steel rule, 300 mm.
- Combination spanner, 17 mm.
Added control
WARNING: Do not remove the belt guard until the isolator is locked off. A drive that starts during the check pulls fingers into the pulley nip. Safety verify
Procedure
- Remove the belt guard.
- Inspect the full length of the drive belt for cracks.
- Measure the distance between the two pulley centres with the steel rule.
- Apply 20 N to the centre of the drive belt span with the tension gauge.
- Read the deflection from the tension gauge.
- Refit the belt guard. Remove your lock and tag from the isolator.
Needs SME approval
What to observe
- Step 2: The drive belt surface is continuous, with no crack across a rib.
- Step 5: Deflection measures 1.5 mm for each 100 mm of centre distance. SME verify
- A deflection outside this figure requires adjustment before the machine returns to service. Use procedure ADJ-04.
Variations
- Check interval is a permitted judgment. The standard interval is 14 days. Reduce it to 7 days when the machine runs above its rated duty.
- The deflection figure is a requirement. It stays the same whatever the machine condition, the operator preference, or the age of the drive belt.
04What changed, counted
These count the contents of the sample above and below. They are not client results.
| Criterion | Source | Written output |
|---|---|---|
| Document identity | 7unnumbered sentences | 1titled, referenced procedure |
| Numbered steps | 0 | 6 |
| Stated prerequisites | 0 | 3 |
| Tools given a specification | 0 | 3 |
| Names for one component | 4 | 1 |
| Safety statements with a consequence | 0 | 1 |
| Measurable acceptance criteria | 0 | 1 |
05Questions returned to the SME
Nine questions the source raises and cannot answer. Every question returned is a decision the client keeps.
- What is the approved deflection figure for this drive belt, and which document holds it?
- Is 20 N the specified test force, or is it the force this gauge applies?
- Does the deflection figure change with belt width, belt type, or centre distance?
- What is the tightening torque for the four motor foot bolts?
- Which crack pattern requires belt replacement, and which is acceptable wear?
- What is the required check interval, and which running condition shortens it?
- Which findings require the machine to stay out of service until maintenance attends?
- Who is qualified to adjust drive belt tension, and does that need a signed authorisation?
- Which tools are approved for this task, and is an adjustable spanner permitted?
A remembered feel became a figure any technician reads off a gauge. The isolation step moved from an aside in the middle to prerequisite 1.
Five more problems, five full samples
Each row names a problem in the client’s words and shows one line of the source beside one line of the result. Three of them open the same five-step treatment as the sample above.
Operations documentation
“Two staff do the same job two different ways”
Standard operating procedureThe cost: Rework, damaged equipment, late starts.
“Every trainer teaches it differently”
Training guide moduleThe cost: Certification cannot be defended.
“Nobody can find the answer, so they guess”
Reference materialThe cost: Damage, and repeated questions.
“We have a manual and people still ask”
Manual front matterThe cost: The manual gets blamed, then ignored.
Technical documentation
“Support takes the same call every week”
Technical procedureThe cost: Support cost scales with sales.
Choose the document by the problem
The document type is a decision, not a preference. Using the wrong one is why a manual gets written and then ignored.
People perform one task differently
Someone needs to complete one task correctly
New staff need to learn a skill
People keep searching for the same answer
The whole operation needs one controlled source
From expert knowledge to approved documentation
Seven steps. Two of them are shown below with the work they produce.
01
Capture. Interview, transcript, demonstration, notes, existing documents.
02
Diagnose. Find missing prerequisites, sequence gaps, undefined terms, contradictions, and safety questions.
03
Structure. Choose the document type and information architecture.
04
Draft. Convert the source into executable instructions.
05
Verify. Return technical, practice, and safety questions to the SME.
06
Test. Check whether a reader can perform the task without hidden knowledge.
07
Approve. Record owner, version, approver, and issue date.
Writer
What tells you the tension is right?
Technician
I push it with my thumb. After twenty years you feel it.
Writer
A technician in their first week has no twenty years. What can they measure instead?
Technician
Deflection. Push the middle of the span and see how far it drops.
Writer
How far should it drop, and with how much push?
Technician
A millimetre and a half per hundred of centre distance. Twenty newtons on the gauge.
Writer
What do they do when it drops further than that?
Technician
Slacken the four motor foot bolts, pull the motor back, tighten up, measure again.
Acceptance criterion
Deflection measures 1.5 mm for each 100 mm of centre distance under 20 N. SME verify
Corrective sequence, procedure ADJ-04
- Loosen the four motor foot bolts.
- Move the motor away from the driven pulley until the deflection reaches the acceptance criterion.
- Tighten the four motor foot bolts to the torque on the machine data sheet.
- Measure the deflection again.
Who owns what
- Technical accuracy
- Safety claims
- Limits and exceptions
- Permitted variations
- The final procedure
- Information architecture
- Sequencing
- Terminology
- Procedural clarity
- Document consistency
- Version structure
What makes an instruction usable
- One instruction per sentence
- Use imperative verbs
- Put steps in execution order
- One term for one concept
- Avoid unnecessary noun clusters
- Keep procedural sentences short
- Put warnings before the related action
- State the consequence
- Flag unverified safety claims
- Use lists for sequences
- Separate prerequisites from instructions
- Keep exceptions close to the affected step
My procedural writing approach is informed by ASD-STE100 principles: Controlled terminology, short instructions, explicit sequencing, and warnings before the action they protect.
I do not need to be the subject expert
The subject changes every time. The job stays the same: Find what the source leaves out, then build the structure that answers it.
What a source leaves out is predictable, and it changes with the kind of document rather than with the subject.
Software
Typically missing
State, failure condition, expected result.
Operations
Typically missing
Owner, timing, exception, handoff.
Training
Typically missing
Outcome, sequence, assessment.
Physical procedure
Typically missing
Prerequisite, tool specification, safety boundary, observable result.
Selected work
The documentation and knowledge-operations work behind this service, written up in full.